Skip to content
Home88 · 上海居间行
Talk to us

Guides/First 72 hours

First 72 hoursMove-in inspection and deposit evidence

Move-in inspection and deposit evidence

The deposit comes back on the dated photographs you take today. WeChat-compressed pictures without a date, and no meter readings, are how both sides later tell a different story.

  1. 01

    Original files, date visible in the phone. Do not send the archive through WeChat. Keep a compressed set for the landlord if you must.

  2. 02

    Every room, ceiling, floor, inside cabinets, appliance plates, remotes, keys and fobs counted.

  3. 03

    Water, electricity, hot water, gas: meter number and reading, dated.

  4. 04

    Washer in the unit or a shared room? A dryer bay — vented or condenser — and whether you may drill. Balcony hanging and outward poles.

  5. 05

    Fibre already in the wall? Broadband is a separate contract from the meters. Villa: which gate lets the engineer in.

  6. 06

    Riders and parcels: does the gate let them in, or is it a locker / management desk. Write the Chinese door number.

  7. 07

    A written defect list, Chinese and English, signed or confirmed by company email.

  8. 08

    Furniture delivery, if any, is a separate sign-off. Do not mix it with the flat’s defects.

Housing Lane houses: leaks, electrics, window seals, whether you may drill, a missing dryer. Villas: garden drainage, which gate, garage remotes — number the rooms. Japanese bathtubs: the first look in the bathroom. Korean extraction: ask in the first minute. Serviced: still photograph existing marks on the operator’s list.

First 72 hours

Each guide gives the official process with source links and effective dates, plus the pitfalls we have recorded from real cases. Anything requiring a licence is referred to registered providers only.

Live near what you love.

Tell us the school, the dates, and the corridor you are looking at.

All sections

Property

Solutions

Settling in

Community

Living here